* Problems: New Cut was first formed in 1974 when the eastern end of Trinity Island was breached during Hurricane Carmen. This breach was further widened by Hurricane Juan in 1985 and Hurricane Andrew in 1992. — The Isles Dernieres shoreline is one of the most rapidly deteriorating barrier shorelines in the U.S., exhibiting a pattern of fragmentation and disintegration. — With regard to long shore sediment transport systems or the movement of beach material by waves and currents, the islands have ultimately become sources of sediment themselves leading to an ever-decreasing volume of sediment.
* Restoration Strategy: The purpose of this project was to close the breach between Trinity and East Islands through the direct creation of beach, dune, and marsh habitat. This project also lengthened the structural integrity of eastern Isles Dernieres by restoring the littoral drift by adding sediment into the nearshore system (restoring about 8,000 linear feet of barrier island).

* Location: New Cut is the breach between East and Trinity Islands in the Isles Dernieres barrier island chain. The cut is bordered on the north by Lake Pelto, on the west by Trinity Island, on the east by East Island and on the south by the Gulf of Mexico, in Terrebonne Parish, Louisiana.
* Progress to Date: A rock dike and approximately 2 million cubic yards of dredged material reconstructed a dune and marsh platform to protect the shoreline from erosion and to restore interior marsh lost from subsidence and saltwater intrusion.
Phase 2 (construction) funding was initially approved at the January 2001 Louisiana Coastal Wetlands Conservation and Restoration Task Force meeting and additional funds allocated in 2006 to account for change in borrow site and post-hurricane increased construction costs. Dredging was completed July 2007. About 8,000 linear feet of barrier island was restored by placing approximately 850,000 cubic yards of material. New Cut was closed through the construction of a dune platform matching the dune elevations on the east and west, strengthening the connection between East and Trinity Islands. Nine species of native barrier island vegetation were planted along with over 17,000 linear feet of sand fencing. No maintenance is anticipated over the 20-year design life.
* This Project is on Priority Project List (PPL) 9.
* Federal Sponsor:

* Local Sponsor:

Featured Image Source : https://cims.coastal.louisiana.gov/outreach/ProjectView.aspx?projID=TE-0037