The original proposed restoration strategy included installing two small siphons (averaging 400 cubic feet per second) to divert water from the Mississippi River; gapping spoil banks on Bayou Chevreuil; gapping spoil banks along the borrow beside Louisiana Highway 20; installing culverts under Louisiana Highway 20; improving drainage in impounded swamps; and planting cypress and tupelo seedlings in highly degraded swamp areas.
The proposed diversion from the Mississippi River was to bring fresh water, fine-grained sediments, and nutrients into the upper des Allemands swamps, which would have helped maintain swamp elevation, improve swamp water quality, and increase productivity and regrowth of young trees as older trees die. However, after hydrologic modeling and more detailed engineering/design and cost estimation, it was determined that the siphon would cost far more than originally anticipated. For that reason, the CWPPRA Task Force approved the project sponsors’ request to re-scope the project to eliminate the siphon feature, and to focus on the remaining project features.

Location: The project is located West of Lac des Allemands in St. James Parish, Louisiana, south of the town of South Vacherie, bordered on the south by Bayou Chevreuil, and on the east by LA Highway 20.
Progress to Date: The Louisiana Coastal Wetlands Conservation and Restoration Task Force approved Phase 1 funding in January 2001. In June 2013, the Task Force approved a request to change the scope of the project to eliminate a siphon feature and focus on the remaining original hydrologic restoration and vegetative planting project features. The Louisiana Coastal Protection and Restoration Authority performed the engineering and design services. Design was completed in October 2015 and Phase 2 funds for construction was approved by the Task Force in January 2016. Construction activities for excavation and placement began in October 2017 and ended on December 20, 2017, vegetative plantings occurred in late January, and officially completed on February 2, 2018.
1. Eight (8), 400-foot-long, strategically designed gaps were cut in the northern Bayou Chevreuil spoil bank to reverse the effects of impoundment;
2. Sixteen (16) spoil placement areas were created on each side of the channel banks; (1 placement area on both sides of each gap) to beneficially use the dredged material on site;
3. Seven hundred (700) Bald Cypress and one hundred (100) Water Tupelo saplings were planted in the constructed spoil placement areas to start swamp regeneration and swamp productivity.
This project is on Priority Project List (PPL) 10.
The sponsors include:
Federal Sponsor: U.S. Environmental Protection Agency
Local Sponsor: Coastal Protection and Restoration Authority (CPRA)