Cole’s Bayou Marsh Restoration

banner-01

Project area wetlands are undergoing loss at -0.42 %/year
based on 1983 to 2011 USGS data from the extended
boundary. Wetland loss processes in this area include
subsidence/sediment deficit, interior ponding and pond
enlargement, and storm impacts resulting in rapid episodic
losses. In addition, significant interior marsh loss has
resulted from salt water intrusion and hydrologic changes
associated with increasing tidal influence. As hydrology in
this area has been modified, habitats have shifted to more of
a floatant marsh type, resulting in increased susceptibility to
tidal energy and storm damages. Habitat shifts and
hydrologic stress reduce marsh productivity, a critical
component of vertical accretion in wetlands.

The specific goals of the project are: 1) create 365 acres of
brackish marsh in recently formed shallow open water; 2)
nourish 53 acres of existing brackish marsh; and, 3) increase
freshwater and sediment inflow into interior wetlands by
improving project area hydrology.

This project aims to create 365 acres and nourish 53 acres of
brackish marsh via dedicated dredging with borrow from
nearby Vermilion Bay. Although Vermilion Bay is not
considered an “external” source of material, significant
sediment inflows into this area may result in some borrow
area infilling. Half of the marsh creation acres would be
planted. The project will encourage additional freshwater
nutrient and sediment inflow from Freshwater Bayou Canal
by dredging a portion of Cole’s Bayou along with the
installation of a series of culverts throughout the project
area.

The culverts located along the northern project boundary are
envisioned to allow the ingress of sediment, water, and
fisheries organisms into the semi-impounded project area,
but avoid backflow of water and potential loss of interior
marsh sediment (i.e., north to south flow only). The culverts
located along the southern project boundary are envisioned
to allow water to drain out of the marsh.

tv63_20120131

This project is located in Region 3, Teche/Vermilion Basin,
Vermilion Parish, east of Freshwater Bayou Canal.

This project is on Priority Project List (PPL) 21.

The Cole’s Bayou Marsh Restoration sponsors include:

 

Advertisements

Cameron-Creole Freshwater Introduction

CS-49-01

Virtually all of the project area marshes have experienced
increased tidal exchange, saltwater intrusion, and reduced
freshwater retention resulting from hydrologic changes
associated with the Calcasieu Ship Channel and the GIWW.
In addition, thousands of acres of marsh were damaged by
Hurricane Rita and again, more recently, by Hurricane Ike.
Because of man-made alterations to the hydrology, it is
unlikely that those marshes will recover without
comprehensive restoration efforts. The Cameron-Creole
Watershed Project has successfully reduced salinities and
increased marsh productivity. However, the area remains
disconnected from freshwater, sediments, and nutrients
available from the GIWW.

The freshwater introduction project would restore the
function, value, and sustainability to approximately 22,247
acres of marsh and open water by improving hydrologic
conditions via freshwater input and increasing organic
productivity.

map

The project area is located on the east side of Calcasieu Lake
and west of Gibbstown Bridge and Highway 27.

This project is on Project Priority List (PPL) 18.

The Cameron-Creole Freshwater Introduction sponsors include:

Keep up with this project and other CWPPRA projects on the project page.

LaBranche East Marsh Creation

wordpress fact sheet banner-01

Dredging of access and flotation canals for the construction
of I-10 and the Illinois Central Railroad resulted in increased
salinity and altered hydrology in the area that exacerbated
the conversion of wetland vegetation into shallow open
water bodies.

The project’s primary goal is to restore marsh that has been
converted to open water. Project implementation will result
in an increase of wildlife and fisheries habitat, acreage and
diversity, along with improving water quality. In addition,
the project will provide a storm buffer protection to I-10, the
region’s primary westward hurricane evacuation route, and
complement hurricane protection measures in the area.
Project features consist of the creation of 729 acres of marsh
and the nourishment of 202 acres of existing marsh using
dedicated dredging from Lake Pontchartrain. In addition,
10,000 linear feet of tidal creeks will be created. The marsh
creation area will have a target elevation the same as average
healthy marsh for this region. Plans are to place the dredge
material in the target area with the use of low level, noncontinuous
retention dikes along the edge of the project area
allowing overtopping of material to nourish the marsh fringe.
Vegetative plantings will be utilized in the areas deemed
most critical by the project team. Successful wetland
restoration in the immediate area (PO-17) clearly
demonstrates the suitability and stability of soil and material
availability from a sustainable borrow area.

map.jpg

The project features are located between Lake Pontchartrain
and I-10 in St. Charles Parish, Louisiana. It is bounded on
the west by the Fall Canal and the Bayou LaBranche
Wetland Creation Project (PO-17) and the east by a pipeline
canal.

This project is on Project Priority List (PPL) 19.

The LaBranche East Marsh Creation project sponsors include:

Keep up with this project and other CWPPRA projects on the project page.

 

Cheniere Ronquille Barrier Island Restoration

wordpress fact sheet banner-01

This area is undergoing shoreline erosion, interior wetland
loss, overwash, and breakup. The Gulf shoreline erosion rate
has doubled from 1988 to 2006. Project area marshes also
are being eroded at -11.8 ft/yr between 2003 to 2006 as well
as being converted to open water from internal breakup.

Restoration would expand the Gulf shoreline structural
integrity and associated protection by tying into two recently
constructed projects to the east and address one of the
remaining reaches of the Barataria/Plaquemines shoreline.
The design includes fill for a beach and dune plus 20-years
of advanced maintenance fill, as well as fill for marsh
creation/nourishment. The location of the type and amount
of sediment needed to construct this project already has been
identified under the East Grand Terre Project that is presently
under construction. Approximately 127 acres of beach/dune
fill would be constructed and approximately 259 acres of
marsh creation/nourishment would be constructed. Intensive
dune plantings would be conducted by seeding and installing
approved nursery stock. About half of the
marsh platform would be planted with cordgrass and
portions of the dune, swale, and marsh would be planted
with appropriate woody species. Containment dikes would
be breached no later than year three to allow tidal exchange
with the created marsh.

map.jpg

The project is located in Region 2, within the Barataria Basin
portion of Plaquemines Parish.

This project is on Project Priority List (PPL) 19.

The Cheniere Ronquille Barrier Island Restoration project sponsors include:

Keep up with this project and other CWPPRA projects on the project page.

 

Kelso Bayou Marsh Creation

wordpress fact sheet banner-01

The most significant environmental problem affecting the
marshes in this area is deterioration and conversion to open
water. Marsh loss has and continues to occur as a result
of salt water intrusion and sediment export (erosion). The
construction of the Calcasieu Ship Channel and the Gulf
Intracoastal Waterway greatly increased the efficiency
of water exchange through Calcasieu Pass. Freshwater
retention was consequently reduced and salt water is able
to enter interior marshes and penetrate further north and
west. Project-area marshes are connected to the navigation
channels through a network of canals and bayous including
Kelso Bayou and Alkali Ditch. Unvegetated substrate
is vulnerable to increased tidal exchange and immense
quantities of organic substrate are being exported.
Recent marsh loss and scouring at the mouth of Kelso
Bayou from impacts related to Hurricanes Rita and Ike allow
increased salt water intrusion, tidal exchange, and storm
surge impacts.

The goal of this project is to restore and protect
approximately 319 acres of critically important marsh
and the numerous functions provided by those areas. The
proposed project will restore a portion of the historic
meandering channel of Kelso Bayou and provide direct
protection to Louisiana State Highway 27, the region’s only
northward hurricane evacuation route. Project features
include creating/nourishing 319 acres of marsh, 3,200 linear
feet of shoreline protection, and rock armor at the mouth of
Kelso Bayou to prevent additional tidal scour.

map

This project is located in Region 4, Calcasieu-Sabine Basin,
Cameron Parish. The project features are located in an area
south of the Gulf Intracoastal Waterway and just west of the
Calcasieu Ship Channel.

This project is on Project Priority List (PPL) 20.

The Kelso Bayou Marsh Creation project sponsors include:

Keep up with this project and other CWPPRA projects on the project page. 

Coastwide Vegetative Planting

LA-39-01

The coastal restoration community has long recognized the benefits of vegetative plantings in restoration. Many marsh creation and most terracing projects require plantings to insure success. Coastal shoreline plantings have also proven to be very effective and some have demonstrated the ability to not only stop shoreline erosion but to facilitate accretion, the process of increasing sediments. Recent hurricane events have exposed a need to have a mechanism in place where large-scale planting efforts can be deployed in a timely manner to specifically targeted areas of need, anywhere along the coast. Although the CWPPRA program can fund specific large-scale planting projects, the normal program cycle for individual projects can delay needed restoration plantings for a number of years.

The goals of this project are to facilitate a consistent and responsive planting effort in coastal Louisiana that is flexible enough to routinely plant on a large scale and be able to rapidly respond to critical areas of need following storm or other damaging events. This project set up an advisory panel consisting of representatives from various state and federal agencies who would assist in the selection of projects for funding. The project also set up a mechanism by which project nominations would be submitted for consideration. The equivalent of 90 acres of interior marsh and 40,000 linear feet of coastal shoreline will be planted per year over a 10 year period to effectively create/protect a total of 779 net acres of marsh over the 20-year project life.

map

The project features are located in the coastal zone of Louisiana.

This project is on Priority Project List (PPL) 20.

The Coastwide Vegetative Planting project sponsors include:

Keep up with this project and other CWPPRA projects on the project page.

 

LaBranche Central Marsh Creation

banner

Dredging of access/flotation canals for construction of I-10 resulted in increased salinity & altered hydrology that exacerbated conversion of wetland vegetation into shallow open water bodies. Land loss is estimated to be -0.543 percent/year based on USGS data from 1984 to 2011 within the extended project boundary.

The primary goal is to restore marsh that converted to shallow open water. Project implementation will result in an increase of fisheries and wildlife habitat, acreage, and diversity along with improving water quality. The proposed project will provide a protective wetland buffer to the railroad and I-10, the region’s primary westward hurricane evacuation route, and complement hurricane protection measures in the area.

The proposed solution consists of the creation of 762 acres of emergent wetlands and the nourishment of 140 acres of existing wetlands using dedicated dredging from Lake Pontchartrain. The marsh creation area will have a target elevation the same as average healthy marsh. It is proposed to place the dredge material in the target area with the use of retention dikes along the edge of the project area. If degradation of the containment dikes has not occurred naturally by Target Year 3, gapping of the dikes will be mechanically performed. Successful wetland restoration in the immediate area (PO-17 constructed in 1994) clearly demonstrates the ability for these wetlands to be restored using material from a sustainable borrow area (outlet end of Bonnet Carre Spillway). Engineering monitoring surveys of the marsh creation area and borrow area are planned as well.

map

This project is located in the Pontchartrain Basin (Region 1), St. Charles Parish. It is bounded to the north by the railroad running parallel to I-10, to the west by the marsh fringe just east of Bayou LaBranche, to the south by Bayou Traverse and to the east by marsh fringe west of a pipeline canal.

This project is on Priority Project List (PPL) 21.

The LaBranche Central Marsh Creation project sponsors include:

Keep up with this project and other CWPPRA projects on the project page.