Airboats: A Tool for Restoration

Navigating wetlands can be difficult for traditional boats due to the changes in water depth and the amount of mud and muck, as well as the meandering of the waterways. Because of these complications, boats that travel both over land and water are needed to explore coastal wetlands. The creation of airboats and innovations in their design have allowed for greater exploration of wetlands and are vital to CWPPRA’s wetland restoration.

Airboats evolved since their introduction in 1905 by Alexander Graham Bell, who is also credited as the inventor of the telephone. His first model was named the “Ugly Duckling”, a crude test vehicle that incorporated an aircraft propeller mounted on the back of a simple pontoon boat. Over the next decade, further developments turned airboats into World War I reconnaissance vessels. Following the end of the war, commercialization led to a rise in popularity among civilians with companies designing taxis and recreation vessels alongside independent innovators creating their own airboat designs. One of the most revolutionary models was built in 1943 at Bear River Migratory Bird Refuge in Utah and dubbed the “Alligator I”. This design was the first known to use air rudders rather than traditional rudders, and most airboats today replicate the Alligator I’s flat bottom hull with air rudders. [1]

Thanks to the inventors at Bear River, Louisiana’s wetlands are more navigable than ever. Further developments have allowed airboats to pass over land, increased passenger capacity and engine horsepower, allowing those in pursuit of recreation, scientific research, and sport hunting/fishing to reach previously inaccessible parts of our wetlands. CWPPRA teams visit project sites using airboats to help get an idea of problems to be addressed through the duration of projects, ensuring the best quality of restoration for our coast. Restoration and preservation have been made easier with creative solutions like airboats, so we would like to recognize the innovators who worked a century ago to improve upon each other’s designs. Once again, the land loss crisis and need for wetland restoration in Louisiana is too large for us to do it alone. We need all the help we can get from innovators like those at Bear River Migratory Bird Refuge to help restore our coast.

 

[1] https://en.wikipedia.org/wiki/Airboat#First_prototypes

Featured image is from a CWPPRA site visit to our BA-34-2 project.

South Lake Lery Shoreline & Marsh Restoration (BS-16)

wordpress fact sheet banner BS-16-01

Reasons for Restoration:

According to USGS-land loss analysis, much of the southern and western shorelines of Lake Lery and the surrounding wetlands were heavily damaged in 2005 by Hurricane Katrina. In the years following this storm, wind induced waves within the lake have begun to cause further damage to the lake’s shorelines. Currently the shorelines have become so damaged that the interior emergent marshes that are still intact are being exposed to the damaging waves. This has caused an increased loss of emergent marsh habitat. Even with the benefits of the Caernarvon Diversion Structure, without some type of restoration in this area, these marshes may not be able to fully recover.

Restoration Strategy:

This is a marsh creation and shoreline restoration project. The marsh creation aspect of the project will have a hydraulic dredge extract material from the Lake Lery water bottom and pump that material into contained marsh creation cells located south and west of the southern and western Lake Lery shorelines. This will create and/or nourish approximately 642 acres of intertidal intermediate marsh. The shoreline restoration component of the project will  have a barge-mounted dragline excavating material from the bottom of Lake Lery and placing that material along the southern and western shorelines. This restored shoreline will have a 50 foot crown width and be built to a height considered high intertidal marsh.

BS-16_map.png
Progress to Date:
This project received Phase II funding in January 2012. Construction began in the spring of 2015 and is expected to be complete in the summer of 2018. All marsh creation is complete. Earthwork and vegetative plantings associated with the lake rim embankments are complete. There are ongoing discussions regarding erosion concerns along lake rim embankments.
This Project is on Project Priority List 17.

The Sponsors for this Project include:

sponsors_1.pngFederal Sponsor: U.S. Fish and Wildlife Service

Local Sponsor: CPRA

 

West Fourchon Creation & Nourishment Marsh

banner-01

The primary causes of land loss in the project area are oil
and gas canals, subsidence, and sediment deprivation, which
have resulted in an estimated rate of -0.41% per year based
on hyper-temporal analysis conducted by USGS for the
extended project boundary for the years 1984 to 2012.
Bounded by Bayou Lafourche to the east and Timbalier Bay
to the west the project area is also subject to shoreline
erosion.

This project would create 302 acres of saline inter-tidal marsh
and nourish 312 acres of emergent marsh using material
dredged from the Gulf of Mexico, southwest of the project
area. Earthen containment dikes will be constructed along
the project boundary to contain the material. Vegetative
plantings are planned at a 50% density, with half planned at
TY1 and half planned at TY3 if necessary. Containment
dikes will be degraded or gapped by TY3 to allow access for
estuarine organisms. Funding will be set aside for the
creation of tidal creeks if needed. This project, along with
TE-23 West Belle Pass Headland Restoration and TE-52
West Belle Pass Barrier Headland Restoration, will help
stabilize the edge of the marshes and protect Port Fourchon
from the west. The initial construction elevation is +2.4 feet
NAVD 88; after settlement, marsh is expected to be +1.4
NAVD 88.

te134_20150305

The project is located in Region 3, Terrebonne Basin, in
Lafourche Parish.

This project was approved for Phase I Engineering and
Design in January 2015.

This project is on Priority Project List (PPL) 24.

The West Fourchon Creation & Nourishment Marsh sponsors include:

 

Cameron-Creole Freshwater Introduction

CS-49-01

Virtually all of the project area marshes have experienced
increased tidal exchange, saltwater intrusion, and reduced
freshwater retention resulting from hydrologic changes
associated with the Calcasieu Ship Channel and the GIWW.
In addition, thousands of acres of marsh were damaged by
Hurricane Rita and again, more recently, by Hurricane Ike.
Because of man-made alterations to the hydrology, it is
unlikely that those marshes will recover without
comprehensive restoration efforts. The Cameron-Creole
Watershed Project has successfully reduced salinities and
increased marsh productivity. However, the area remains
disconnected from freshwater, sediments, and nutrients
available from the GIWW.

The freshwater introduction project would restore the
function, value, and sustainability to approximately 22,247
acres of marsh and open water by improving hydrologic
conditions via freshwater input and increasing organic
productivity.

map

The project area is located on the east side of Calcasieu Lake
and west of Gibbstown Bridge and Highway 27.

This project is on Project Priority List (PPL) 18.

The Cameron-Creole Freshwater Introduction sponsors include:

Keep up with this project and other CWPPRA projects on the project page.

LaBranche East Marsh Creation

wordpress fact sheet banner-01

Dredging of access and flotation canals for the construction
of I-10 and the Illinois Central Railroad resulted in increased
salinity and altered hydrology in the area that exacerbated
the conversion of wetland vegetation into shallow open
water bodies.

The project’s primary goal is to restore marsh that has been
converted to open water. Project implementation will result
in an increase of wildlife and fisheries habitat, acreage and
diversity, along with improving water quality. In addition,
the project will provide a storm buffer protection to I-10, the
region’s primary westward hurricane evacuation route, and
complement hurricane protection measures in the area.
Project features consist of the creation of 729 acres of marsh
and the nourishment of 202 acres of existing marsh using
dedicated dredging from Lake Pontchartrain. In addition,
10,000 linear feet of tidal creeks will be created. The marsh
creation area will have a target elevation the same as average
healthy marsh for this region. Plans are to place the dredge
material in the target area with the use of low level, noncontinuous
retention dikes along the edge of the project area
allowing overtopping of material to nourish the marsh fringe.
Vegetative plantings will be utilized in the areas deemed
most critical by the project team. Successful wetland
restoration in the immediate area (PO-17) clearly
demonstrates the suitability and stability of soil and material
availability from a sustainable borrow area.

map.jpg

The project features are located between Lake Pontchartrain
and I-10 in St. Charles Parish, Louisiana. It is bounded on
the west by the Fall Canal and the Bayou LaBranche
Wetland Creation Project (PO-17) and the east by a pipeline
canal.

This project is on Project Priority List (PPL) 19.

The LaBranche East Marsh Creation project sponsors include:

Keep up with this project and other CWPPRA projects on the project page.

 

Cheniere Ronquille Barrier Island Restoration

wordpress fact sheet banner-01

This area is undergoing shoreline erosion, interior wetland
loss, overwash, and breakup. The Gulf shoreline erosion rate
has doubled from 1988 to 2006. Project area marshes also
are being eroded at -11.8 ft/yr between 2003 to 2006 as well
as being converted to open water from internal breakup.

Restoration would expand the Gulf shoreline structural
integrity and associated protection by tying into two recently
constructed projects to the east and address one of the
remaining reaches of the Barataria/Plaquemines shoreline.
The design includes fill for a beach and dune plus 20-years
of advanced maintenance fill, as well as fill for marsh
creation/nourishment. The location of the type and amount
of sediment needed to construct this project already has been
identified under the East Grand Terre Project that is presently
under construction. Approximately 127 acres of beach/dune
fill would be constructed and approximately 259 acres of
marsh creation/nourishment would be constructed. Intensive
dune plantings would be conducted by seeding and installing
approved nursery stock. About half of the
marsh platform would be planted with cordgrass and
portions of the dune, swale, and marsh would be planted
with appropriate woody species. Containment dikes would
be breached no later than year three to allow tidal exchange
with the created marsh.

map.jpg

The project is located in Region 2, within the Barataria Basin
portion of Plaquemines Parish.

This project is on Project Priority List (PPL) 19.

The Cheniere Ronquille Barrier Island Restoration project sponsors include:

Keep up with this project and other CWPPRA projects on the project page.

 

Kelso Bayou Marsh Creation

wordpress fact sheet banner-01

The most significant environmental problem affecting the
marshes in this area is deterioration and conversion to open
water. Marsh loss has and continues to occur as a result
of salt water intrusion and sediment export (erosion). The
construction of the Calcasieu Ship Channel and the Gulf
Intracoastal Waterway greatly increased the efficiency
of water exchange through Calcasieu Pass. Freshwater
retention was consequently reduced and salt water is able
to enter interior marshes and penetrate further north and
west. Project-area marshes are connected to the navigation
channels through a network of canals and bayous including
Kelso Bayou and Alkali Ditch. Unvegetated substrate
is vulnerable to increased tidal exchange and immense
quantities of organic substrate are being exported.
Recent marsh loss and scouring at the mouth of Kelso
Bayou from impacts related to Hurricanes Rita and Ike allow
increased salt water intrusion, tidal exchange, and storm
surge impacts.

The goal of this project is to restore and protect
approximately 319 acres of critically important marsh
and the numerous functions provided by those areas. The
proposed project will restore a portion of the historic
meandering channel of Kelso Bayou and provide direct
protection to Louisiana State Highway 27, the region’s only
northward hurricane evacuation route. Project features
include creating/nourishing 319 acres of marsh, 3,200 linear
feet of shoreline protection, and rock armor at the mouth of
Kelso Bayou to prevent additional tidal scour.

map

This project is located in Region 4, Calcasieu-Sabine Basin,
Cameron Parish. The project features are located in an area
south of the Gulf Intracoastal Waterway and just west of the
Calcasieu Ship Channel.

This project is on Project Priority List (PPL) 20.

The Kelso Bayou Marsh Creation project sponsors include:

Keep up with this project and other CWPPRA projects on the project page. 

Coastwide Vegetative Planting

LA-39-01

The coastal restoration community has long recognized the benefits of vegetative plantings in restoration. Many marsh creation and most terracing projects require plantings to insure success. Coastal shoreline plantings have also proven to be very effective and some have demonstrated the ability to not only stop shoreline erosion but to facilitate accretion, the process of increasing sediments. Recent hurricane events have exposed a need to have a mechanism in place where large-scale planting efforts can be deployed in a timely manner to specifically targeted areas of need, anywhere along the coast. Although the CWPPRA program can fund specific large-scale planting projects, the normal program cycle for individual projects can delay needed restoration plantings for a number of years.

The goals of this project are to facilitate a consistent and responsive planting effort in coastal Louisiana that is flexible enough to routinely plant on a large scale and be able to rapidly respond to critical areas of need following storm or other damaging events. This project set up an advisory panel consisting of representatives from various state and federal agencies who would assist in the selection of projects for funding. The project also set up a mechanism by which project nominations would be submitted for consideration. The equivalent of 90 acres of interior marsh and 40,000 linear feet of coastal shoreline will be planted per year over a 10 year period to effectively create/protect a total of 779 net acres of marsh over the 20-year project life.

map

The project features are located in the coastal zone of Louisiana.

This project is on Priority Project List (PPL) 20.

The Coastwide Vegetative Planting project sponsors include:

Keep up with this project and other CWPPRA projects on the project page.

 

LaBranche Central Marsh Creation

banner

Dredging of access/flotation canals for construction of I-10 resulted in increased salinity & altered hydrology that exacerbated conversion of wetland vegetation into shallow open water bodies. Land loss is estimated to be -0.543 percent/year based on USGS data from 1984 to 2011 within the extended project boundary.

The primary goal is to restore marsh that converted to shallow open water. Project implementation will result in an increase of fisheries and wildlife habitat, acreage, and diversity along with improving water quality. The proposed project will provide a protective wetland buffer to the railroad and I-10, the region’s primary westward hurricane evacuation route, and complement hurricane protection measures in the area.

The proposed solution consists of the creation of 762 acres of emergent wetlands and the nourishment of 140 acres of existing wetlands using dedicated dredging from Lake Pontchartrain. The marsh creation area will have a target elevation the same as average healthy marsh. It is proposed to place the dredge material in the target area with the use of retention dikes along the edge of the project area. If degradation of the containment dikes has not occurred naturally by Target Year 3, gapping of the dikes will be mechanically performed. Successful wetland restoration in the immediate area (PO-17 constructed in 1994) clearly demonstrates the ability for these wetlands to be restored using material from a sustainable borrow area (outlet end of Bonnet Carre Spillway). Engineering monitoring surveys of the marsh creation area and borrow area are planned as well.

map

This project is located in the Pontchartrain Basin (Region 1), St. Charles Parish. It is bounded to the north by the railroad running parallel to I-10, to the west by the marsh fringe just east of Bayou LaBranche, to the south by Bayou Traverse and to the east by marsh fringe west of a pipeline canal.

This project is on Priority Project List (PPL) 21.

The LaBranche Central Marsh Creation project sponsors include:

Keep up with this project and other CWPPRA projects on the project page.

Coastwide Reference Monitoring System

In 1990, the U.S. Congress enacted the Coastal Wetlands Planning, Protection and Restoration Act (CWPPRA) in response to the growing awareness of Louisiana’s land loss
crisis. CWPPRA was the first federal, statutorily mandated program with a stable source of funds dedicated exclusively to the short- and long-term restoration of the coastal wetlands of Louisiana. Between 1990 and 2016, 108 restoration projects were constructed through the CWPPRA program. These projects include diversions of freshwater and sediments to improve marsh vegetation; dredged material placement for marsh creation; shoreline protection; sediment and nutrient trapping; hydrologic restoration through outfall, marsh, and delta management; and vegetation planting on barrier islands.

The coastal protection and restoration efforts implemented through numerous CWPPRA crms_wetlandsprojects require monitoring and evaluation of project effectiveness. There is also a need to assess the cumulative effects of all projects to achieve a sustainable coastal environment. In 2003, the Louisiana Office of Coastal Protection and Restoration (now CPRA) and the U.S. Geological Survey (USGS) received approval from the CWPPRA Task Force to implement the Coastwide Reference Monitoring System (CRMS) as a mechanism to monitor and evaluate the effectiveness of CWPPRA projects at the project, region, and coastwide levels (Steyer and others, 2003). The CRMS network is currently funded through CWPPRA and provides data for a variety of user groups, including resource managers, academics, landowners, and researchers.

The effectiveness of a traditional monitoring approach using paired treatment and reference sites is limited in coastal Louisiana because of difficulty in finding comparable test sites; therefore, a multiple reference approach using aspects of hydrogeomorphic functional assessments and probabilistic sampling was adapted into the CRMS design. The CRMS approach gathers information from a suite of sites that encompass a range of ecological conditions across the coast. Trajectories of changing conditions within the reference sites can then be compared with trajectories of change within project sites. The CRMS design not only allows for monitoring and evaluating the effectiveness of each project but will also support ongoing evaluation of the cumulative effects of all CWPPRA projects throughout the coastal ecosystems of Louisiana. Simulations made by using the resampling methodology described in Steyer and others (2003) indicated that 100 randomly selected reference sites would accurately represent the true composition of coastwide vegetation at a 95 percent confidence level. However, in order to detect a 20 percent change in coastal marsh vegetation between two time periods, at least 80 percent of the time, approximately 400 reference sites were needed. Because of land rights and other technical issues, 390 sites with a fixed annual sampling design were approved and secured for CRMS data collection. These 390 CRMS sites are located within nine coastal basins and four CWPPRA regions, covering the entire Louisiana coast. Site construction and data collection began in 2005.

Because of the quantity of products and data that will be produced over the lifetime of the CRMS project, a website (http://www.lacoast.gov/crms) was designed to be a one-stop shop for CRMS information, products, and data. The ecological data available through the website are linked to the official Louisiana CPRA database – the Coastal Information Management System (CIMS), which houses all CWPPRA monitoring data, on topics such as the following: hydrology, herbaceous marsh vegetation, forested swamp vegetation, soil properties, soil accretion, and surface elevation. Data provided by the Louisiana CPRA are available for downloading at https://cims.coastal.louisiana.gov/. The basic viewer (under Mapping) on the CRMS Web site provides a user-friendly interface for viewing information on specific sampling sites, including photos, data summaries, and report cards. Analytical teams are developing mechanisms by which individual sampling sites can be assessed in relation to other sites within the same marsh type, hydrologic basin, and CWPPRA project. These multi-scale evaluations will be presented on a “Report Card” tab within the basic viewer. The CRMS program is as dynamic as the coastal habitats it monitors. The program continues to develop new products and analysis tools while providing data for model improvement and scientific research. The CRMS Web site is the current dissemination mechanism for all activities related to the program. For a beginner’s guide to retrieving CRMS data, visit https://www.lacoast.gov/new/Ed/CRMS_Manual.pdf.

crms
Reference:

Steyer, G.D., Sasser, C.E., Visser, J.M., Swensen, E.M., Nyman, J.A., and Raynie, R.C., 2003, A proposed coast-wide reference monitoring system for evaluating wetland restoration trajectories in Louisiana: Environmental Monitoring and Assessment, v. 81, p. 107–117.