Bayou Sale Shoreline Protection (TV-20)

A foreshore rock dike, such as the one shown above, may provide an alternative type of shoreline protection to the eastern shoreline of East Cote Blanche Bay.

Location

The project is located along the eastern shoreline of East Cote Blanche Bay, from British-American Canal to the mouth of Bayou Sale, in St. Mary Parish, Louisiana.

Problems

Shoreline erosion at an estimated rate of 13.5 feet per year is being caused by the open water fetch and resulting wave energy from East Cote Blanche Bay. The retreating shoreline has resulted in a substantial loss of live oak forest, emergent wetlands, and critical habitat used by a multitude of fish and wildlife species, including the endangered Louisiana black bear.

Restoration Strategy

The goal of this project is to reduce or, if possible, reverse shoreline erosion and create marsh between the breakwater and existing shoreline. Project plans include construction of 35,776 linear feet of foreshore rock dike parallel to and approximately 150 feet out from the existing eastern shoreline of East Cote Blanche Bay. The rock dike will be tied into the banks of all substantial channels. Smaller channels and sloughs will have provisions for adequate drainage and aquatic organism access via openings through the dredge material and gaps in the dike. It is anticipated that approximately 123 acres of marsh will be created with the fill material from the dredging of an access channel to accommodate construction equipment.

map

Progress to Date

The Louisiana Coastal Wetlands Conservation and Restoration Task Force approved the engineering and design phase of this project in January 2004. Planning is ongoing.

The project is on Priority Project List (PPL) 13.

The Federal Sponsor is Natural Resources Conservation Service.

The Local Sponsor is CPRA.

Approved Date: 2004
Project Area: 370 acres
Approved Funds: $1.85 M
Total Est. Cost: $1.85 M
Net Benefit After 20 Years: 329 acres
Status: Deauthorized
Project Type: Shoreline Protection

Freshwater Bayou Bank Stabilization (ME-13)

By placing riprap in front of the existing shoreline, further wetland loss will be decreased dramatically. It is anticipated that open water areas behind the rock structure will accumulate sediments and eventually become vegetated.

Location

This project is located along the west bank of Freshwater Bayou Canal near Little Vermilion Bay, 4 miles southwest of Intracoastal City, Louisiana, in Vermilion Parish. It
extends north from North Prong and Belle Isle Bayou to Sixmile Canal.

Problems

Increased tidal action, saltwater intrusion, and boat wakes have accelerated erosion long the banks of the Freshwater Bayou Canal. The spoil banks have completely eroded in some areas. The remaining spoil banks along the southern reach of the project area separate Freshwater Bayou Canal from several interior marsh ponds. If the banks breach, shoreline erosion will accelerate interior marsh loss.

Restoration Strategy

The objective of this project was to prevent further wetland loss through the reduction of bank erosion and subsequent tidal scour of shoreline marshes. Approximately 23,193 linear feet of freestanding rock dike were constructed in shallow water along the west bank of Freshwater Bayou Canal (from its confluence with Sixmile Canal on the northern end and North Prong to the south).

map

Progress to Date

The local cost share for this project was provided by Acadian Gas Company. Construction began in March 1998 and was completed in May 1998. The monitoring plan was approved in February 1997. To date, monitoring has consisted of documenting the pre-construction shoreline position relative to the rock dike and a land-to-water analysis of the preconstruction aerial photography that was taken in January 1997. This project is on Priority Project List 5.

The project is on Priority Project List (PPL) 5.

The Federal Sponsor is National Resources Conservation Service

The Local Sponsor is CPRA.

Approved Date: 1996
Project Area: 1,724 acres
Approved Funds: $5.56 M
Total Est. Cost: $8.91 M
Net Benefit After 20 Years: 511 acres
Status: Completed June 1998