Fritchie Marsh Creation and Terracing

banner-01

A significant portion of the Fritchie Marsh was lost due to
Hurricane Katrina. Post storm shallow open water areas
dominate the landscape which limits the effectiveness of the
PO-06 CWPRRA project. Wetlands in the project vicinity
are being lost at the rate -1.09%/year based on USGS
data from 1985 to 2015. These marshes cannot recover
without replacement of lost sediment, which is critical if the
northshore marshes are to be sustained.

Project goals include restoring and nourishing marsh.
Specific goals of the project are: 1) create approximately 291
acres of marsh; 2) nourish approximately 49 acres of existing
marsh; and 3) construct about 36,610 feet of earthen terraces
or 26 emergent acres.

An alternative analysis was conducted leading to the
selection of features and configuration to compliment and
work synergistically with the existing PO-06 project and
planned mitigation and restoration projects in the Fritchie
Marsh. A robust engineering cost is included to evaluate
increasing the project size if costs allow or adjust the
layout, if needed during Phase 1. Approximately 2 million
cubic yards of material would be placed confined to restore
291 acres and nourish approximately 49 acres of brackish
marsh. Material would be dredged from a borrow site in
Lake Pontchartrain. The borrow site would be designed to
avoid and minimize impacts to aquatic habitat and existing
shorelines. Approximately 26 acres of earthen terraces would
be constructed within various locations totaling approximately
36,610 feet or 523 acres of terrace field. All containment
dikes would be gapped or degraded no later than three years
after construction to facilitate the development of tidal marsh
functions supportive of estuarine species. The terraces would
be planted as well as 50% of the created marsh acres to
expedite colonization and enhance stabilization.

PO173_20160211

Region 1, Pontchartrain Basin, St. Tammany Parish, located
approximately three miles southeast of Slidell, Louisiana. A
substantial portion of the project is located on Big Branch
National Wildlife Refuge.

This project was approved for Phase I Engineering and
Design in January 2016.

This project is on Priority Project List (PPL) 25.

The Fritchie Marsh Creation and Terracing sponsors include:

 

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s